1.1 How the document was produced
The HYPER project started on 1 November 2006 and ended in February 2009. The work programme of the HYPER project was structured around the development of this installation permitting guide (IPG) and includes:
- An assessment of current knowledge on installation requirements of small stationary hydrogen and fuel cell systems;
- Detailed case studies of representative installations;
- Modelling and experimental risk evaluation studies to investigate fire and explosion phenomena.